What Should a Chain Sling Factory Inspection Report Include?
Why this matters
Two parts can look identical in a catalogue yet behave differently on site. Organising the facts in a checkable order reduces rework and repeated questions.
01 / Material and heat number
The report should trace back to a steel heat number that matches the ordered grade, so the paperwork and the delivered batch refer to the same goods.
02 / Dimensions and visual checks
Link dimensions, weld position, surface defects and accessories are normally sampled. Sampling ratio and acceptance rules should be stated.
03 / Load tests and marking
Rated load, proof load and breaking load are different values. Tags, nameplates and certificates must carry the matching report number.
For lifting and safety-critical slings, always refer to current standards and supplier qualifications.
Put this on your checklist
- Match the report number with the physical nameplate
- Confirm proof load and rated load are separate values
- Put sampling ratio and acceptance rules into the purchase annex
Every item can be checked on its own without extra tooling. Record the result in one table with reviewer, date and source document for later review.